Productivity, higher-value steels to drive Tata European transformation

Tata Steel says its transformation programme in Europe plans to improve the company’s run-rate Ebitda to £750 million ($899m) by March 2021 – equal to about 10% Ebitda margin.
About three-quarters of the performance uplift will come from productivity improvements, reduced bureaucracy and increased sales of higher-value steels, the steelmaker informed the European Works Council. Employment cost savings will make up the remainder.
Tata Steel in Europe chief executive Henrik Adam says: Steel has a bright future in Europe – enabling everything from low-carbon transportation and energy production to energy-efficient homes and fully-recyclable food packaging – and we want to be part of that future as an industry leader… Our future relies upon our ability to fund investments needed to raise the bar in innovation and carbon-efficient steelmaking.”
Last month Tata said it plans to cut 3,000 jobs, of which 1,600 will be in the Netherlands and 1,000 in the UK (see Kallanish passim). The company started on 27 November the employee consultation process with the European Works Council.
ArcelorMittal Europe announces CO2 emissions reduction “…roadmap”

ArcelorMittal Europe has announced a CO2 roadmap to reduce emissions -30% by 2030. This is in line with the steelmaker’s plan announced in May to be carbon neutral in Europe by 2050.
The roadmap, for ArcelorMittal Europe – Flat Products, is based on three distinct pathways that have the potential to deliver a significant reduction in carbon emissions.
These include “clean power steelmaking”, i.e. using clean power as the energy source for hydrogen-based steelmaking, and longer term for direct electrolysis steelmaking. “Circular carbon steelmaking,” meanwhile, is using circular carbon energy sources, such as waste biomass, to displace fossil fuels in steelmaking, thereby enabling low-emissions steelmaking. “Fossil fuel carbon capture and storage” is maintaining the current method of steel production but then capturing and storing the carbon, or re-using it rather than emitting into the atmosphere.
Among the initiatives under way to contribute to the goal are the €65 million ($73m) investment to use hydrogen for the direct reduction of iron ore at the Hamburg site. Also being carried out is the construction of a carbon capture and storage pilot project, 3D, which will begin at ArcelorMittal Dunkirk in 2020.
ArcelorMittal Europe – Flat Products chief executive Geert Van Poelvoorde says the roadmap is “…not a one-size-fits-all model, as different parts of our business are at varying starting points. For some sites, certain technologies will work while others will be suited to another route. We’ve spent the last few years testing a range of technologies and now is the time to scale up and put them into action, with the support of the EU and member states, to ensure we are able to fully decarbonise.”
Last week ArcelorMittal voiced its support for the European Commission’s European Green Deal package (see Kallanish passim).
Benteler to close Bottrop tube plant

Benteler says it plans to close its Bottrop welded tube plant in 2022. The firm has provided details of its plan announced in November for a restructuring and associated job cuts at its Steel/Tube division.
Bottrop capacities will be gradually reduced from 2020. Most production will be successively transferred to Schloss Neuhaus and Paderborn. This will lead to a reduction of up to 255 jobs at Bottrop, but 100 new jobs – mainly in production – are to be created at Schloss Neuhaus and Paderborn. In the field of seamless tubes, Benteler says it will focus more strongly on core markets, and will adapt capacities at the Dinslaken plant.
All the measures will lead to an overall reduction in employment of up to 600 jobs in the next three years, in a socially responsible manner, Benteler tells Kallanish. Sites affected will be Bottrop (up to 255 jobs), Dinslaken (up to 90 jobs) and Lingen (up to 10 jobs), and in the administration and indirect areas in Paderborn/Schloss Neuhaus (up to 195 jobs).
Benteler reiterates that the decisions were instigated by a strongly changed market environment. Prices in the global steel tube market are declining, and the outlook for the oil & gas, automotive and industrial markets is still deteriorating, it says.
Italian government reveals industrial plan for Ilva

Following a meeting with unions, Italian Minister Stefano Patuanelli has revealed the first details of the government’s industrial plan for former steelmaker Ilva, now ArcelorMittal Italia.
A union representative tells Kallanish the plan is worth €1 billion ($1.1 billion) and will involve the ramp up of production from the 6 million tonnes/year suggested by ArcelorMittal to 8m t/y. This would imply no job cuts. Production will be implemented with two blast furnaces and a new electric arc furnace. Temporary lay-offs are envisaged during the works to add a new EAF.
Patuanelli says the government is still working on the details of the plan. Including the environmental relaunch of the Taranto site and the ramp-up of production, the industrial plan should be implemented within 4 to 5 years.
The Italian government previously rejected the industrial plan submitted by ArcelorMittal Italia. The steelmaker said it would cut almost 4,700 jobs during the next three years. The first cuts would be in 2020 while the remainder would be in 2023 when the company proposes to idle blast furnace No. 2 and launch an EAF at the Taranto site (see Kallanish passim).

