German steel industry presses for infrastructure action as Rhine disruption persists

Low water levels on the Rhine River continue to disrupt German steel logistics, prompting industry leaders to call for urgent government action to prevent recurring transport bottlenecks from becoming a permanent competitive disadvantage for the country’s manufacturing sector.

The persistent drought conditions affecting Europe’s most important industrial waterway have forced steelmakers to adapt their logistics strategies, with thyssenkrupp, the largest German steelmaker, maintaining its use of externally chartered vessels with lower draft capabilities to supply its Duisburg site. The company’s own push-barge fleet remains out of service due to insufficient water depth.

“The situation on the Rhine remains challenging,” a thyssenkrupp Steel spokesperson told Platts, part of S&P Global Energy, on Aug. 18. The company’s dedicated low-water task force continues to monitor conditions closely, though customer supply remains secure for now through the deployment of specialized vessels secured as a precautionary measure.

The ongoing disruption has elevated the issue to the political agenda, with Federal Transport Minister Steffen Bilger convening high-level talks on Aug. 6 with industry representatives to address the structural vulnerabilities exposed by recurring low-water events.

The German Steel Association used the ministerial meeting to press for concrete infrastructure improvements and policy measures to mitigate future disruptions. Inland waterways handle approximately one-third of the steel industry’s transport volume, making Rhine navigability critical to maintaining competitive operations.

“The persistent low water situation poses considerable challenges for industry and jeopardizes the security of supply as well as the competitiveness of Germany as a business location,” said Kerstin Maria Rippel, managing director of the German Steel Association, following the Aug. 6 talks.

While steel companies have implemented precautionary measures including additional storage capacity and flexible logistics chains following previous low-water episodes, Rippel said industry cannot compensate for structural transport infrastructure deficits alone.

The association is calling for accelerated unloading optimization on the Middle and Lower Rhine, strengthened rail capacity as a reliable alternative route, and additional transport capacity on road and rail during crisis situations.

The Rhine’s water levels have been under pressure since mid-July following a summer heat wave and scarce rainfall. The German Federal Waterways and Shipping Administration has reported record-low water levels in the Rhine River, with levels below 10 centimeters at the Kaub chokepoint in mid-August with the low water levels expected to persist through all August.

For thyssenkrupp Steel’s Duisburg site, one of Europe’s largest steelmaking hubs, the disruption has already necessitated adjustments to hot metal production due to constraints in raw material supply. The facility relies heavily on stable inbound logistics for iron ore, coal and other bulk inputs typically transported via the Rhine system from North Sea ports.

Author: Annalisa Villa

Platts Logo

spglobal.com